Interarch Building Solutions has strengthened its position in the structural steel segment after securing a ₹80 crore order for a pre-engineered steel building (PEB) system. The contract covers end-to-end execution, including design, engineering, manufacturing, supply, and on-site erection, underscoring the company’s integrated capabilities in steel construction.
While the client remains undisclosed due to commercial considerations, the six-month execution timeline highlights the speed and efficiency associated with PEB solutions. The order follows a previous ₹60 crore contract of a similar nature, reinforcing a steady inflow of steel-intensive projects.
These back-to-back wins reflect sustained demand for pre-engineered steel structures across industrial and infrastructure sectors, where faster construction cycles and material efficiency are increasingly critical. Interarch’s growing order book signals rising adoption of steel-led building systems in India, positioning the company to benefit from ongoing industrial capex and the broader shift toward engineered steel construction.



